Tuesday, January 15, 2019

Update 2 years later

We realized we have been really bad at sharing the construction progress and we decided to pick up where we left off, two years ago, and show you how the construction evolved since then since the house is almost COMPLETE.

The Owners have been managing the entire construction process and they are doing an unbelievable job at making sure every details if PERFECT as intended!

Below are a few pictures with the butterfly roof after the TPO was installed.  A few reasons we selected TPO roofing:

  1. highly reflectable
  2. recyclable
  3. high albedo





Monday, November 28, 2016

Floor Framing

Floor framing is going up.
 The bridge that links the three parts of the house is beginning to take shape.
 View from under the Main House.
 All three wings of the house are linked by bridges










Form Work

The footings are complete and the formwork for the concrete retaining walls are in place!